Welcome, and congratulations on your appointment as architectural professional for a stand in Waterfall Country Estate. If you are a home owner, congratulations on the purchase of your new property.
THE PLAN APPROVAL PROCESS
STAGE 1
Plan Submission Process
-
Complete and submit.
-
Use as a guide to ensure all required infoformation is provided.
-
Complete and submit.
-
Complete and submit.
-
Complete and submit.
-
Complete and submit for alteration submissions.
-
This form should be provided before the final inspection is requested by the owner, confirming that the architect has performed the required on-site inspections and the building has been constructed according to plan.
-
Proof of payment
The design concept and sketch plans must be submitted to the Aesthetics Committee, or its designated service provider, for approval. A scrutiny fee, as determined from time to time, will be payable upon submission of the plans. This fee is for the approval of stage 1 and stage 2 and may be required again should there be any further changes, amendments etc to the approved stage 2 plans.
-
Phase 1 Drawing - 3 x A1 sheets in electronic PDF format
Please make use of Form B to make sure that all the required information has been provided
NOTE: All documentation including erf diagrams, services connection diagrams and contour plans that may be required in order to facilitate the design process, are available on the CD (which is free of charge and may be obtained from the sales office at the estate).
STAGE 2
Plan Submission Process
-
One set of the detailed design and working drawings.
After the Phase 1 drawings have been approved, one set of the detailed design and working drawings must be submitted to the Aesthetics Committee for approval in electronic PDF format, via WeTransfer. Provide all required information as prescribed in Form B for Phase 2 submission.
-
Confirmation of WAN (Waterfall Access Networks) approval.
Waterfall Access Networks is a service provider that ensures that every home in the estate is equipped with the required infrastructure to facilitate data reticulation throughout the house.
Please click on the link below to the datasheet. This is a basic and quick approval procedure that runs parallel to the plan approval process.
After approval of the stage 2 working drawings, additional sets of drawings may be delivered to the Studious office between 08:00 and 09:00 for approval stamps. Please bear in mind that the Aesthetics Committee will always keep a set of plans for our records.
STAGE 3
Plan Submission Process
After the working drawings have been approved by the Aesthetic Commitee, these stamped plans must be submitted to the local authority for approval. Certain prescribed fees will be payable at this stage to the local authority. These aesthetics rules are in addition to, and do not supersede, the requirements of the local authority or any statutory authority or the National Building Regulations.
STAGE 4
Construction Site: Registration with Trafalgar
At this stage, plan approval has been obtained from the Local Authority and you as the owner have appointed a building contractor to perform all the intendedbuilding work.
It is of utmost importance that before any construction takes place, the building contractor registers the project with Estate management (Trafalgar) and a building deposit is paid by the owner. The Contractor will sign on behalf of the owner that the house will be built as per the approved plans and that any intended deviation will be formally submitted to Studious Aesthetics for approval first. The contractor will also undertake that he will be liable to a penalty fee for any construction work that has not formally been approved.
Once the contractor has successfully registered the site, the construction may commence.
STAGE 5
Request for Completion Certificate from the HOA Aesthetical Committee
I have completed my house as per approved plans, what now?
When the construction of the new house has been completed AND an occupation certificate from the local authority has been obtained, you are ready to request a final inspection from Studious Aesthetics to release the building deposit and obtain a Final Completion Certificate.
Please Complete Form G and email it to inspections@studious.co.za. The inspection will be performed by Studious Aesthetics and members of the HOA Aesthetics Committee and feedback will be provided within a period of 2-3 weeks from the receipt of Form G.